Uganda projects $250bn needed to boost power capacity to 52,000 MW by 2040 from 2,000 MW now
John Muchira in Nairobi 15 September 2023
Authorization required to access this document
Access to this document was denied as the document is available to subscribers only. If you are not a subscriber, please register and buy subscription in order to get access. If you are a subscriber, you need to log in to access the document.
Follow us online