TPIPP allocates $430mn for 3-year plan to build new power plants, focusing on cost reduction by switching to waste fuel
Juthatip Kumarn 18 March 2024
Authorization required to access this document
Access to this document was denied as the document is available to subscribers only. If you are not a subscriber, please register and buy subscription in order to get access. If you are a subscriber, you need to log in to access the document.
Follow us online