TPIPP allocates $430mn for 3-year plan to build new power plants, focusing on cost reduction by switching to waste fuel

Authorization required to access this document

Access to this document was denied as the document is available to subscribers only. If you are not a subscriber, please register and buy subscription in order to get access. If you are a subscriber, you need to log in to access the document.

Login to NewsBase